Sl No | SHQ | Name of Project | Qty | Tentative Cost( in Rs Cr) | Present Staus |
---|---|---|---|---|---|
1 | Airforce | Design and development of High Altitude Parachute Penetration System | Prototype stage- 40 Nos. | AIP accorded on 16.09.2022. | |
2 | Airforce | Wire Rope Antenna for Mi – 17 Helicopter | 40/yr. | AIP accorded on 16.9.2022. | |
3 | Airforce | Tail Rotor Blade for Mi – 17 Helicopter | AIP accorded on 16.9.2022 | ||
4 | Army | Vehicle Mounted Counter Swarm Drone System by SHQ(Army) | AIP accorded on 16.9.2022. | ||
5 | Army | Automated Infantry Mortar System (AIMS) | AIP accorded on 16.9.2022 | ||
6 | Army | Drone based Mine Detection and Diffusion System | 74 sets | 172 cr. | AIP accorded on 16.9.2022. |
7 | Navy | Next Generation Helo Harnessing and Traversing System (NGHHTS) | Bulk – 11 Nos. (5 Nis. (IN) + 6 Nos. (ICG)) Prototype – 1 set | Prototype – 70 cr./unit Bulk – 40 Cr./unit | AIP accorded on 16.09.2022. |
8 | Army | Development of V/UHF Handheld Satellite Software Defined Radio (SDR) | Project approved in principle. | ||
9 | Airforce | L/P band Synthetic Aperture Radar (SAR) Small Satellite | Project approved in principle. | ||
10 | Airforce | Ultralight weight, Sub-Meter Resolution Monolithic SiC Telescope as Optical Payload | Project approved in principle. | ||
11 | Airforce | Development of a Computer Defence System for Cyber Situational Awareness to Secure own Satellites from Cyber Attacks. | Approved in Principle | ||
12 | Airforce | Development of Network Management Port (NMP) for efficient SATCOM Bandwidth Management using multiple satls | Project Approved in Principle | ||
13 | Airforce | Autonomous Docking Operations for OOMR | Project approved in principle. | ||
14 | Airforce | Cyber hardening Suite for Satellite Comn links/Hubs | Project approved in principle. | ||
15 | Airforce | Ultra High Resolution Optical payloads with Edge Computing for VLEO Bus | Project approved in principle. | ||
16 | Airforce | HySIS Payloads for VLEO Bus | Project approved in principle. | ||
17 | Navy | Quantum Encryption Modules for Secure Satellite Communication | Project approved in principle. | ||
18 | HQIDS | Development of modular small satellite bus for rapid integration into the launcher | Project approved in principle. | ||
19 | HQIDS | Small Satellite Launch vehicle for launching satellite weighing 150 -650kg to LEO | Project approved in principle. | ||
20 | HQIDS | Integration of Optical and Radar Sensors into a network with AI based Analytics | Project approved in principle. | ||
21 | HQIDS | Imagery data fusion for Optical and Radar data sources | Project approved in principle. | ||
22 | HQIDS | Geo-AI based Multi-Sensor Optical/Radar Equipment Siting Simulator | Project approved in principle. | ||
23 | HQIDS | Development of Orbital Transfer Vehicle for Space Debris removal in LEO | Project approved in principle. | ||
24 | HQIDS | Development of Space-grade robotic arm with ground-control | Project approved in principle. | ||
25 | HQIDS | Development of a Mini Imaging/Comn Satellites for LoD | Project approved in principle. | ||
26 | HQIDS | Laser based comn system as modular payload for Small LEO satellites offering > 1.5 Gbps data transfer rate between LEO and GEO Data Relay Satl | Project approved in principle. | ||
27 | HQIDS | Development of V-band based Inter-satellite Link communication module for Small Satellites offering data rate upto 1.5 Gbps | Project appoved in principle. | ||
28 | Navy | Compact Autonomous Surface Craft All Domain Effects-Anti Submarine Warfare (CASCADE-ASW) | Prototype - 1 Nos. + Bulk - 16 Nos. | Prototype - 120/unit + Bulk - 80/unit (IN), 40/unit (ICG) | AIP accorded on 16.01.2023. |
29 | Navy | Shore Based Guided Rocket (SB-GR) System | Prototype - 1 Nos. + Bulk - 7 Nos. | Prototype - 100/unit + Bulk - 80/unit | AIP accorded on 16.01.2023. |
30 | Navy | Semi-submersible Autonomous Vessel for Intelligence, Operations & Reconnaissance (SAVIOR) - ASW | Prototype - 1 Nos. + Bulk - 40 Nos. | Prototype - 100/unit + Bulk - 19/unit | AIP accorded on 16.01.2023. |
31 | Army | Anti Tk Mine 'TANDAV' | 10,000 Nos. | AIP accorded on 16.01.2023. | |
32 | Airforce | Main Rortor Blade (Mi - 17 Helicopter) | 25 sets/year for 5 years | AIP accorded on 16.01.2023. | |
33 | Airforce | Tail Rotor Chain (Mi - 17 Helicopter) | 30 pieces/year for 5 years | AIP accorded on 16.01.2023. | |
34 | Airforce | Automatic Takeoff Landing Recording System | 60 | Feasibility study in progress. | |
35 | Airforce | Common Launcher for Su-30 MKI aircraft | Feasibility study in progress. | ||
36 | Navy | Light Weight High Speed Marine Engine for Naval Boats | 01 + 240 Bulk | AIP Accorded on 6.4.2022. Feasibility study in progress. | |
37 | Navy | Oily Water Separator (OWS) System | AIP accorded on 6.4.2022. AoN accorded by SPB on 18.01.2023. | ||
38 | Navy | Ship based Rukmani SATCOM Terminals | AIP Accorded on 6.4.2022. Feasibility study is in progress. | ||
39 | Navy | 127 mm Guided Projectile | AIP accorded on 21.6.2022. Feasibility study initiated. | ||
40 | Navy | Turbocharger for P-75 | AIP accorded on 21.6.2022. Feasibility study initiated. | ||
41 | Airforce | Development of indigenous repair & overhaul facility for SAFIR APU of MI-17 V5 Helicopters (Suo Moto) | 300/yr | AIP accorded on 11.7.2022. | |
42 | Airforce | Aircraft Recovery Dollies | 200 of different capacity | 160 | AIP accorded on 11.7.2022. |
43 | Airforce | Drone/UAS mounted Aircraft Emulator | 50 | 300 | AIP accorded on 11.7.2022. |
44 | Airforce | Multi Band Navigation Receiver (Suo Moto) | 25 | 12 | AIP accorded on 11.7.2022. |
45 | Airforce | Transition Platform with trailer | 50 | 60 | AIP accorded on 11.7.2022. |
46 | Airforce | Aircraft Lifting Slings | 30 | 20 | AIP accorded on 11.7.2022. |
47 | Navy | 30 mm Ammunition for Naval Surface Gun | 100+156800 rounds (31500 rounds/yr for 5 years) | 121.66 | AIP accorded on 11.7.2022. |
48 | Airforce | Lightening Detection system | 50 | Pre-AoN stage. | |
49 | Airforce | Wind Profiler | 50 | EOI issued | |
50 | Army | Multi-Purpose Fork Lift Truck | 133 (IA-111 & IN-32 ) | 112 Cr. | AoN accorded on 30 Oct 21. EoI issued on 14.12.21. PSO issued on 16.3.22.. Prototype development in progress |
51 | Navy | Marine Grade Aluminium Alloy Plates | 30 Tons | 2.75 | AoN accorded on 24.2.22. PSO issued on 17.01.2023. |
52 | Airforce | Indigenous Precision Range Extension Kit | Feasibility study completed. | ||
53 | Airforce | Airborne ruggedized Flight Instrumentation System | 1 | Feasibility study completed. PSQR stage. | |
54 | Navy | Supersonic Weapon Imitating Flying Targetv | IN - 30 IA-10 | Feasibility study in progress. | |
55 | Navy | Integrated Standby Instrument System | 70 | 27 | Feasibility study in progress. |
56 | Navy | Buoyancy Glider for enhancing underwater Domain Awareness | 01 + 50 Bulk | Feasibility study completed. Pre-AoN stage. | |
57 | Army | Integrated Drone Detection and Interdictions Sys (IDD&IS) (Improved Version) | - | - | Feasibility study in progress |
58 | Army | Low Level Light Weight Radar | Feasibility Approved | ||
59 | Army | Runway Independent Remotely Piloted Aircraft System | - | - | Feasibility Approved |
60 | Army | Autonomous - Surveillance And Armed Drone Swarm (Desert/plains) {A-SADS(desert/ plains)} | - | - | Feasibility Approved |
61 | Army | Autonomous - Surveillance And Armed Drone Swarm High Altitude Area {A-SADS (HAA)} | - | - | Feasibility Approved. EoI issued on 22.9.2022. |
62 | Army | VSHORADS (Laser Beam Riding) | EOI issued. | ||
63 | Navy | Glidefire SSM | 115 | 230 | AIP accorded on 6.4.2022. Feasibility study in progress |
64 | Airforce | Aerial Bomb 1000 Kg | 300/year | Feasibility study stage. | |
65 | Army | Ballistic Helmet | Feasibility study in prog. | ||
66 | Army | Integrated Surveillance and Targeting System for Mechanized Forces | Feasibility study in progress. | ||
67 | Army | Autonomous Combat Vehicle (ACV) | Feasibility study in progress. | ||
68 | Airforce | Development of Wearable Robotic Equipment | 150 | Feasibility study in progress. | |
69 | Airforce | Full Motion Simulator for Apache Helicopter | 1 | Feasibility study in progress. | |
70 | Airforce | Full Motion Simulator for Chinook Helicopter | 01 | Feasibility study in progress. | |
71 | Army | Infantry weapon training simulator (IWTS) | 133 (IA-66, IN-32 & IAF-35) | PSO issued on 25th October 2022. | |
72 | Navy | Marine Sewage Treatment Plant | 10 | 15 | AoN accorded on 31.1.22. PSO issued on 17.01.2023. |
73 | Airforce | 80 MM Rockets | 5000 | Feasibility study in progress. Case under examination for Make-III. SoC circulated under Make-III. | |
74 | Navy | High Endurance Autonomous Underwater Vehicles (HEAUV) | 1+8 | EoI issued on 23.03.2023 | |
75 | Navy | Limpet Mine Mk 414 (7 Kg) and Mk 430 (15 Kg) | 50-7Kg, 100-15Kg | 20.06 | AoN accorded on 04.8.21. EOI issued on 22.9.21. PSO issued on 17.1.2022. Prototype development. |
76 | Army | Drone Kill System | 35 | 78.36 | PSO issued on 28th Oct 2022. |
77 | Navy | Autonomous Surface Vessel in Mine Counter Measures | 1+10 | EoI issued on 17.03.2023. | |
78 | Army | V/UHF Software Define Radio | 600 | 179.12 | PSO issued on 17.02.2021. |
79 | Army | HF Software Define Radio | 300 | 145 | PSO issued on 21st Oct 2022. |
80 | Army | Air Defence Fire Control Radar (light) | 40 | 2171 | Pre AoN |
81 | Army | Truck Mounted Crane for ULH Regts | 132 | 16.12 | EOI issued on 22 Jun 21 PSO issued on 06 Jan 2022 Prototype development. |
82 | Army | Robotic Surveillance System | 185 in two years | 146.25 | Pre AoN Stage. |
83 | Army | AFV Protection and Counter Measure System | 818 | 5308 | PSO issued on 15 Nov 2021 |
84 | Army | Portable Helipad | 50 Sets | 80 | RFP issued on 12th Oct 2022. |
85 | Airforce | Chaff and flares | Chaffs-10,00,000: Flares-1,50,000 (for 5 yr) | 142.62 | Project Sanction Order issued on 13.12.18. Design and development phase. PDC : Oct 2022 |
86 | Airforce | Infrared Imaging Search & Track System (IRST) | 100 | 1850.00 | PSO issued on 28.5.19. Design and Development Phase. PDC : Oct 2022 |
87 | Airforce | Foldable Fiberglass Mat (FFM) for Rapid Runway Repair | 301 | 235 | AoN accorded on 24.7.2019. PSO issued on 4.3.2020. Prototype development. |
88 | Airforce | Aerial Fuse for Bomb | 15000 @3000/Yr | 708 | PSO issued on 10.11.2020. prototype development. PDC : Nov 22 |
89 | Airforce | 125 kg bomb (akin to MK-81 bomb) | 2500 @ 500/yr | 161.8 | PSO issued on 10.11.2020. Prototype development. PDC : Nov 22 |
90 | Airforce | 70 mm Air to Ground Rockets | 80000 (over 3-5 years) | - | Pre-AoN stage. |
91 | Airforce | Inflatable Decoys | 255 | 281.2 | PSO issued on 6.10.2021. Prototype development. PDC : Sep 22 |
92 | Army | 125mm APFSDS Ammunition for T-72 & T-90 Tank | 85,000 | 1955 | PSO issued on 11.11.2020 |
93 | Army | Upgraded Assault Track way | 100 | 100.00 | Project Sanction Order issued on 5.11.18. RFP issued on 24.9.2020. Contract issued on 1st March 2023. |
94 | Army | MEAT (Manoeuvrable Expendable Aerial Target) | 125 | 96.03 Cr | RFP has been issued on 13 July 2020. |
95 | Army | Night Sight for AGS-30 | 804 | 221 | AoN accorded on 15.5.2020. PSO issued on 1.2.2021. |
96 | Army | 155 mm Terminally Guided Munitions | 1966 | 1239.36 | PSO issued on 28th Oct 2022. |
97 | Army | Unit Level Target System - Air Defence | 142 | 29.4 | EOI issued on 3.8.21. |
98 | Army | Mobile Integrated Network Terminal (MINT) | 129 | 285 | PSO issued on 12.3.2021. |
99 | Army | Augmented Reality (AR) based Head Mounted Display System | 556 | 135.81 | AoN accorded on 8.7.2020. PSO issued on 22.2.2021. |
100 | Army | 3rd Gen ATGM (Anti Tank Guided Missile) System | Missiles: 2330, Launcher: 101, Simulator: 06 | 1538.08 | PSO issued on 16.11.2020. |
101 | Army | Integrated air Defence Combat Simulator - Suo-Moto | 16 | 162 | EoI uploaded on 24.8.21. PSO issued on 24 Mar 2022 Prototype development. |
102 | Army | Pre-fragmented programmable proximity fuzed ammunition | 3,30,000 over 12 years | 30.6 | SoC being formulated. |
103 | Army | GPS/GIS based Minefield Recording System | 1840 | 292.35 | PSO issued on 10.12.2020. |
104 | Army | Medium Range Precision Kill System | 10 | 229.5 | PSO issued on 4th November 2022. |
105 | Army | Upgrade for BMP2/2K | 811 | 4210.71 | PSO issued. |
106 | Army | Auxiliary Power Unit (APU) | 3257 (Qty 1600 for Tank T-72 and 1657 for Tank T-90) | Rs 1325.92 Crs | PSO issued on 9.11.2020 |
107 | Navy | Deep Sea Side Scan Sonar Towing Winch (DS4TW) | 06 | 05.54 | Project Sanction order issued on 27.8.18. Prototype development completed on 26th Aug 2019. Contract issued on 4.2.2022. |
108 | Navy | Proximity, DA and Graze fuse for 76/62 SRGM with universal capability for 76-127mm caliber ammunition | 130 Prototype Bulk 5000 Fuzes | 241.00 | PSO issued on 18.5.2021. Prototype development. |
109 | Navy | Digital Beam forming based Satellite TV | 100 | 64.9 | PSO issued on 4th June 2019. FET in progress. |
110 | Navy | Three phase inverters | 25 | 8.44 | PSO issued on 30.5.19. FET is in progress. |
111 | Navy | Expendable Underwater Target | 300 @ 60/yr | 134.52 Cr | AoN Accorded on 2nd April 2019. PSO issued on 15.2.2021. Prototype development. |
112 | Navy | Effectors for Anti-Torpedo Counter Measure System | 174 | 130 | AoN accorded on 8.7.2020. PSO issued on 31.3.2021 and PDC extended by 15 months from Mar 22 to Jul 23. |
113 | Navy | Upper Air Sounding System (UASS) | 24(Navy)+ 36(Army) | 40.00 | RFP issued on 22.7.2021. Staff evaluation in progress. |
Project Name | : | Design and development of High Altitude Parachute Penetration System | SHQ | : | Airforce |
Quantity | : | Prototype stage- 40 Nos. | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Project Status | : | AIP accorded on 16.09.2022. | |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | -- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Wire Rope Antenna for Mi – 17 Helicopter | SHQ | : | Airforce |
Quantity | : | 40/yr. | Project Cost ( in Rs Crore) | : | AIP accorded on 16.9.2022. Cr. |
Project Brief | : | Click Here | Project Status | : | |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Tail Rotor Blade for Mi – 17 Helicopter | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 16.9.2022 |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Vehicle Mounted Counter Swarm Drone System by SHQ(Army) | SHQ | : | Army |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 16.9.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col PS Sidhu | Designation | : | |
Office Address | : | IHQ of MoD (Army), Col Eqpt (Coord), DG Armed Corps, Room No. 501, 'A' Wing, Sena Bhawan, New Delhi- 110011 | Phone | : | 011- 21411764 |
Fax | : | 011-23019825 | : | abhay-6337[at]gov[dot]in |
Project Name | : | Automated Infantry Mortar System (AIMS) | SHQ | : | Army |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 16.9.2022 |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Madhukar Jha | Designation | : | |
Office Address | : | Col Inf -5, DG Inf, Room No. - 411, D1 Wing, Sena bhawan, New Delhi- 110011 | Phone | : | 011- 21411764 |
Fax | : | 011-23019825 | : | abhay-6337[at]gov[dot]in |
Project Name | : | Drone based Mine Detection and Diffusion System | SHQ | : | Army |
Quantity | : | 74 sets | Project Cost ( in Rs Crore) | : | 172 cr. Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 16.9.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col SP Pradhan | Designation | : | |
Office Address | : | Col CE-5(A), Room No. 91, CE Directorate, E-in-C's Branch, Kashmir House, Rajaji Marg, New Delhi- 110011 | Phone | : | 011- 23019604 |
Fax | : | 011-23019825 | : | ce5-einc-army[at]nic[dot]in |
Project Name | : | Next Generation Helo Harnessing and Traversing System (NGHHTS) | SHQ | : | Navy |
Quantity | : | Bulk – 11 Nos. (5 Nis. (IN) + 6 Nos. (ICG)) Prototype – 1 set | Project Cost ( in Rs Crore) | : | Prototype – 70 cr./unit Bulk – 40 Cr./unit Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 16.09.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 06-02-2023 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Commander Rohit Shekhar | Designation | : | |
Office Address | : | Integrated Headquarters, Directorate of Naval Architecture, 200, Talkatora Stadium Annexe New Delhi - 110004 | Phone | : | 011-21410495 |
Fax | : | : | dna[dot]ihqmod[at]navy[dot]gov[dot]in |
Project Name | : | Development of V/UHF Handheld Satellite Software Defined Radio (SDR) | SHQ | : | Army |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 10-06-2023 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Lt Col M D Gopinath | Designation | : | GSO1 DSA |
Office Address | : | Directorate of System Application (DSA) Directorate General of Signals IHQ of MoD of (Army) Room No 635, ‘A‘ Wing, Sena Bhawan DHQ PO, New Delhi-11 | Phone | : | 011-23018984 |
Fax | : | : | skylight[dot]74[at]gov[dot]in |
Project Name | : | L/P band Synthetic Aperture Radar (SAR) Small Satellite | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Air Cmde Sartaj Bedi, VM VSM | Designation | : | Air Cmde Ops (MPR & Space) |
Office Address | : | Phone | : | ||
Fax | : | : | dspace574[at]iaf[dot]nic[dot]in |
Project Name | : | Ultralight weight, Sub-Meter Resolution Monolithic SiC Telescope as Optical Payload | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Air Cmde SB Arun Kumar, VSM | Designation | : | Air Cmde (Int) |
Office Address | : | Phone | : | ||
Fax | : | : | samavesh[at]nic[dot]in |
Project Name | : | Development of a Computer Defence System for Cyber Situational Awareness to Secure own Satellites from Cyber Attacks. | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Approved in Principle |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Air Cmde MK Mishra, VSM | Designation | : | Air Cmde Ops (IEW) |
Office Address | : | Phone | : | ||
Fax | : | : | mastergreen[dot]space[at]gov[dot]in |
Project Name | : | Development of Network Management Port (NMP) for efficient SATCOM Bandwidth Management using multiple satls | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project Approved in Principle |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Air Cmde MR Kane | Designation | : | Air Cmde Ops (Com) |
Office Address | : | Phone | : | ||
Fax | : | : | vayu[dot]sanchar1[at]gov[dot]in |
Project Name | : | Autonomous Docking Operations for OOMR | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Air Cmde Sartaj Bedi, VM VSM | Designation | : | Air Cmde Ops (MPR & Space) |
Office Address | : | Phone | : | ||
Fax | : | : | dspace574[at]iaf[dot]nic[dot]in |
Project Name | : | Cyber hardening Suite for Satellite Comn links/Hubs | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Air Cmde MK Mishra, VSM | Designation | : | Air Cmde Ops (IEW) |
Office Address | : | Phone | : | ||
Fax | : | : | mastergreen[dot]space[at]gov[dot]in |
Project Name | : | Ultra High Resolution Optical payloads with Edge Computing for VLEO Bus | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Air Cmde SB Arun Kumar, VSM | Designation | : | Air Cmde (Int) |
Office Address | : | Phone | : | ||
Fax | : | : | samavesh[at]nic[do]in |
Project Name | : | HySIS Payloads for VLEO Bus | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Air Cmde SB Arun Kumar, VSM | Designation | : | Air Cmde (Int) |
Office Address | : | Phone | : | ||
Fax | : | : | samavesh[at]nic[dot]in |
Project Name | : | Quantum Encryption Modules for Secure Satellite Communication | SHQ | : | Navy |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Capt Manish | Designation | : | |
Office Address | : | Phone | : | ||
Fax | : | : | insc-navy[at]nic[dot]in |
Project Name | : | Development of modular small satellite bus for rapid integration into the launcher | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Small Satellite Launch vehicle for launching satellite weighing 150 -650kg to LEO | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Integration of Optical and Radar Sensors into a network with AI based Analytics | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Imagery data fusion for Optical and Radar data sources | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Geo-AI based Multi-Sensor Optical/Radar Equipment Siting Simulator | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Development of Orbital Transfer Vehicle for Space Debris removal in LEO | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Development of Space-grade robotic arm with ground-control | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Development of a Mini Imaging/Comn Satellites for LoD | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Laser based comn system as modular payload for Small LEO satellites offering > 1.5 Gbps data transfer rate between LEO and GEO Data Relay Satl | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project approved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Development of V-band based Inter-satellite Link communication module for Small Satellites offering data rate upto 1.5 Gbps | SHQ | : | HQIDS |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Project appoved in principle. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col R Jithendra | Designation | : | Col (R&D) DSA |
Office Address | : | Phone | : | ||
Fax | : | : | dirrnddsa[dot]ids[at]gov[dot]in |
Project Name | : | Compact Autonomous Surface Craft All Domain Effects-Anti Submarine Warfare (CASCADE-ASW) | SHQ | : | Navy |
Quantity | : | Prototype - 1 Nos. + Bulk - 16 Nos. | Project Cost ( in Rs Crore) | : | Prototype - 120/unit + Bulk - 80/unit (IN), 40/unit (ICG) Cr. |
Project Brief | : | Project Status | : | AIP accorded on 16.01.2023. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 24-05-2023 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | CDR (SR) - ASW | Designation | : | |
Office Address | : | Directorate of Staff Requirement (DSR) Integrated Headquarters of Ministry of Defence (Navy), Room No. 210 'D' Block Defence Officers Complex Africa Avenue New Delhi, 110023 | Phone | : | 011-26771553 |
Fax | : | 011-26771320 | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Shore Based Guided Rocket (SB-GR) System | SHQ | : | Navy |
Quantity | : | Prototype - 1 Nos. + Bulk - 7 Nos. | Project Cost ( in Rs Crore) | : | Prototype - 100/unit + Bulk - 80/unit Cr. |
Project Brief | : | Project Status | : | AIP accorded on 16.01.2023. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 15-05-2023 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | CDR (SR) - ASW | Designation | : | |
Office Address | : | Directorate of Staff Requirement (DSR), Integrated Headquarters of Ministry of Defence (Navy), Room No. 210 'D' Block, Defence Officers Complex, Africa Avenue, New Delhi, 110023 | Phone | : | 011-26771553 |
Fax | : | 011-26771320 | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Semi-submersible Autonomous Vessel for Intelligence, Operations & Reconnaissance (SAVIOR) - ASW | SHQ | : | Navy |
Quantity | : | Prototype - 1 Nos. + Bulk - 40 Nos. | Project Cost ( in Rs Crore) | : | Prototype - 100/unit + Bulk - 19/unit Cr. |
Project Brief | : | Project Status | : | AIP accorded on 16.01.2023. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 26-05-2023 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | CDR (SR) - ASW | Designation | : | |
Office Address | : | Directorate of Staff Requirement (DSR) Integrated Headquarters of Ministry of Defence (Navy) Room No. 210 'D' Block Defence Officers Complex Africa Avenue New Delhi, 110023 | Phone | : | 011-26771553 |
Fax | : | 011-26771320 | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Anti Tk Mine 'TANDAV' | SHQ | : | Army |
Quantity | : | 10,000 Nos. | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 16.01.2023. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 30-06-2023 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Rajiv Ahlawat | Designation | : | ADB Make-II |
Office Address | : | Room No-16, C Wing, Sena bhawan, New Delhi- 110011 | Phone | : | 011- 21411764 |
Fax | : | 011-23019825 | : | adbmake--02[at]gov[dot]in |
Project Name | : | Main Rortor Blade (Mi - 17 Helicopter) | SHQ | : | Airforce |
Quantity | : | 25 sets/year for 5 years | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 16.01.2023. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Tail Rotor Chain (Mi - 17 Helicopter) | SHQ | : | Airforce |
Quantity | : | 30 pieces/year for 5 years | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 16.01.2023. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Automatic Takeoff Landing Recording System | SHQ | : | Airforce |
Quantity | : | 60 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Aerospace Safety | Designation | : | DG (I&S) Branch |
Office Address | : | DG (I&S) Branch, Air HQ (RKP), Wing-III, First Floor, West Block – VI, RK Puram New Delhi – 110066 | Phone | : | (011) 26172738 |
Fax | : | (011) 26172738 | : | aerospacesafety[at]nic[dot]in |
Project Name | : | Common Launcher for Su-30 MKI aircraft | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Dte of Projects (Su — 30) | Designation | : | Dte of Projects (Su — 30) |
Office Address | : | Room No. 402, Air HQ (VB) Rafi Marg, New Delhi – 110 106 | Phone | : | |
Fax | : | : | flanker[dot]lgs[at]gov[dot]in |
Project Name | : | Light Weight High Speed Marine Engine for Naval Boats | SHQ | : | Navy |
Quantity | : | 01 + 240 Bulk | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Project Status | : | AIP Accorded on 6.4.2022. Feasibility study in progress. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 15-07-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Deepak K | Designation | : | Cdr (Marine Engg)- Indg |
Office Address | : | Phone | : | 011-23010092 | |
Fax | : | 011-23011352 | : | dme-navy[at]nic[dot]in |
Project Name | : | Oily Water Separator (OWS) System | SHQ | : | Navy |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Project Status | : | AIP accorded on 6.4.2022. AoN accorded by SPB on 18.01.2023. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 15-07-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Deepak K | Designation | : | Cdr (Marine Engg)- Indg |
Office Address | : | Phone | : | 011-23010092 | |
Fax | : | 011-23011352 | : | dme-navy[at]nic[dot]in |
Project Name | : | Ship based Rukmani SATCOM Terminals | SHQ | : | Navy |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | AIP Accorded on 6.4.2022. Feasibility study is in progress. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Ram Krishan | Designation | : | |
Office Address | : | Phone | : | 011-23011101 | |
Fax | : | : | dee[at]navy[dot]gov[dot]in |
Project Name | : | 127 mm Guided Projectile | SHQ | : | Navy |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Project Status | : | AIP accorded on 21.6.2022. Feasibility study initiated. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 06-02-2023 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Commander Rajat Kundu | Designation | : | |
Office Address | : | Integrated Headquarters, Directorate of Staff Requirements, D' Block, Defence Officer Complex, Africa Avenue, New Delhi - 110023 | Phone | : | 011-26771336 |
Fax | : | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Turbocharger for P-75 | SHQ | : | Navy |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Project Status | : | AIP accorded on 21.6.2022. Feasibility study initiated. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 28-09-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Lt Cdr Rumesh Menon | Designation | : | Lt Cdr (Marine Engg.) |
Office Address | : | Integrated Head Quarters, Directorate of Marine Engineering (DME), Room No. 10, 'A' Wing, Rajaji Marg, Sena Bhawan, New Delhi - 110011. | Phone | : | 011-23010294, 9495900304 |
Fax | : | 011-23011352 | : | dme-navy[at]nic[dot]in |
Project Name | : | Development of indigenous repair & overhaul facility for SAFIR APU of MI-17 V5 Helicopters (Suo Moto) | SHQ | : | Airforce |
Quantity | : | 300/yr | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 11.7.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Aircraft Recovery Dollies | SHQ | : | Airforce |
Quantity | : | 200 of different capacity | Project Cost ( in Rs Crore) | : | 160 Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 11.7.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 30-09-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Drone/UAS mounted Aircraft Emulator | SHQ | : | Airforce |
Quantity | : | 50 | Project Cost ( in Rs Crore) | : | 300 Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 11.7.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Multi Band Navigation Receiver (Suo Moto) | SHQ | : | Airforce |
Quantity | : | 25 | Project Cost ( in Rs Crore) | : | 12 Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 11.7.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Transition Platform with trailer | SHQ | : | Airforce |
Quantity | : | 50 | Project Cost ( in Rs Crore) | : | 60 Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 11.7.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 30-09-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Aircraft Lifting Slings | SHQ | : | Airforce |
Quantity | : | 30 | Project Cost ( in Rs Crore) | : | 20 Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 11.7.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 30-09-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr Yudhwir Singh | Designation | : | Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | 011-23013225 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | 30 mm Ammunition for Naval Surface Gun | SHQ | : | Navy |
Quantity | : | 100+156800 rounds (31500 rounds/yr for 5 years) | Project Cost ( in Rs Crore) | : | 121.66 Cr. |
Project Brief | : | Project Status | : | AIP accorded on 11.7.2022. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 10-02-2023 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Commander Anubhav Pandey | Designation | : | Cdr(SR)-Gun |
Office Address | : | Integrated Headquarters, Directorate of Staff Requirements 'D' Block, Defence Officer ComplexAfrica Avenue, New Delhi - 110023 | Phone | : | 011-26771336, 9910226331 |
Fax | : | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Lightening Detection system | SHQ | : | Airforce |
Quantity | : | 50 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | Pre-AoN stage. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Wind Profiler | SHQ | : | Airforce |
Quantity | : | 50 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | EOI issued |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 26-12-2022 | EOI Closing Date | : | 03-03-2023 |
Date and Time | : | 19-01-2023 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Multi-Purpose Fork Lift Truck | SHQ | : | Army |
Quantity | : | 133 (IA-111 & IN-32 ) | Project Cost ( in Rs Crore) | : | 112 Cr. Cr. |
Project Brief | : | Click Here | Project Status | : | AoN accorded on 30 Oct 21. EoI issued on 14.12.21. PSO issued on 16.3.22.. Prototype development in progress |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 14-12-2021 | EOI Closing Date | : | 07-02-2022 |
Date and Time | : | 10-01-2022 1100 | Venue | : | Combat Engrs Dte, Engineers in Chief branch, new Delhi 110011 |
Meeting Notice | : | Click Here | Clarifications post meeting | : | Click Here |
Name | : | Col Seetaram, | Designation | : | Col CE-5B |
Office Address | : | (DG CE, CE-5(B)) Sena Bhawan, New Delhi-110011 | Phone | : | 23335799 |
Fax | : | : | ce5-einc-army[at]nic[dot]in |
Project Name | : | Marine Grade Aluminium Alloy Plates | SHQ | : | Navy |
Quantity | : | 30 Tons | Project Cost ( in Rs Crore) | : | 2.75 Cr. |
Project Brief | : | Click Here | Project Status | : | AoN accorded on 24.2.22. PSO issued on 17.01.2023. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 07-05-2021 |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 26-07-2022 | EOI Closing Date | : | 19-09-2022 |
Date and Time | : | 23-08-2022 11:00 hrs. | Venue | : | DNA(Directorate of Naval Architecture) Nodal Directorate. The same will also be through VC for outst |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Suharsh Singh | Designation | : | Cdr-(NA)-MAT |
Office Address | : | Integrated Headquarters Minstry of Defence(Navy) Directorate of Naval Architecture Room no. 200, Naval HQ Annex, Talkatora Stadium New Dehli 110021 | Phone | : | 8697369254 |
Fax | : | 011-21410483 | : | dna[dot]ihqmod[at]navy[dot]gov[dot]in |
Project Name | : | Indigenous Precision Range Extension Kit | SHQ | : | Airforce |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Feasibility study completed. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | --3-2 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Airborne ruggedized Flight Instrumentation System | SHQ | : | Airforce |
Quantity | : | 1 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study completed. PSQR stage. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | 3---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Supersonic Weapon Imitating Flying Targetv | SHQ | : | Navy |
Quantity | : | IN - 30 IA-10 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Project Status | : | Feasibility study in progress. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 21-02-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----3 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Anubhav Pandey | Designation | : | Cdr(SR)-ASW |
Office Address | : | Directorate of Ship Requirement(DSR) Room No.59-A Block,huttment :New Delhi | Phone | : | 011-23010815 |
Fax | : | 011-23010241 | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Integrated Standby Instrument System | SHQ | : | Navy |
Quantity | : | 70 | Project Cost ( in Rs Crore) | : | 27 Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Giriraj Joshi | Designation | : | Cdr APP |
Office Address | : | Room no. 17 B 'A' Block Hutments, Dara sikoh road | Phone | : | 23793011 |
Fax | : | 23793011 | : | dapp[at]navy[dot]gov[dot]in |
Project Name | : | Buoyancy Glider for enhancing underwater Domain Awareness | SHQ | : | Navy |
Quantity | : | 01 + 50 Bulk | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Project Status | : | Feasibility study completed. Pre-AoN stage. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 17-01-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Rishi Raj | Designation | : | Cdr(SR)-ASW |
Office Address | : | Directorate of Ship Requirement(DSR) Room No.59-A Block ,hutment :New Delhi | Phone | : | 011-23010579, 9969321584 |
Fax | : | 011-23010241 | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Integrated Drone Detection and Interdictions Sys (IDD&IS) (Improved Version) | SHQ | : | Army |
Quantity | : | - | Project Cost ( in Rs Crore) | : | - Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | ol R Sathya Narayanan, | Designation | : | Director, Col AAD -7 (GM-SP) |
Office Address | : | Room No 608, D1 Wing, Sena Bhawan, IHQ of MoD(Army)- 11 | Phone | : | 23334001 |
Fax | : | : | skyplan-94[at]nic[dot]in |
Project Name | : | Low Level Light Weight Radar | SHQ | : | Army |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Feasibility Approved |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 16-01-2023 | EOI Closing Date | : | 26-05-2023 |
Date and Time | : | 28-02-2023 1030 | Venue | : | Directorate General of Army AD, AAD-9 (TCR & Make), New Delhi - 110011 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Samudra Vijay Sarma, | Designation | : | Col AAD-9 (TCR & Make) |
Office Address | : | Room No 607, A Wing, Sena Bhawan, | Phone | : | 23334884 |
Fax | : | : | proc[dot]aad-army[at]nic[dot]in |
Project Name | : | Runway Independent Remotely Piloted Aircraft System | SHQ | : | Army |
Quantity | : | - | Project Cost ( in Rs Crore) | : | - Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility Approved |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 10-03-2023 | EOI Closing Date | : | 08-05-2023 |
Date and Time | : | 27-03-2023 1430 hrs | Venue | : | Directorate General of Artillery, Arty-9 (SATA), New Delhi - 110011 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Abhijit Singh | Designation | : | Col Arty-9 (SATA) |
Office Address | : | Sena Bhawan | Phone | : | 8437203203 |
Fax | : | : | abhisingh22four[at]gmail[dot]com |
Project Name | : | Autonomous - Surveillance And Armed Drone Swarm (Desert/plains) {A-SADS(desert/ plains)} | SHQ | : | Army |
Quantity | : | - | Project Cost ( in Rs Crore) | : | - Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility Approved |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 20-09-2022 | EOI Closing Date | : | 15-11-2022 |
Date and Time | : | 26-10-2022 1100 hrs | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Sumeet Bhat | Designation | : | Dte Gen of Armed Corps (AC-3) |
Office Address | : | Dte Gen of Armed Corps (AC-3) Sena Bhawan, IHQ of MoD (Army) New Delhi-110011 | Phone | : | 233 33564 |
Fax | : | : | ddgmf[dot]qmg-ihq[at]nic[dot]in |
Project Name | : | Autonomous - Surveillance And Armed Drone Swarm High Altitude Area {A-SADS (HAA)} | SHQ | : | Army |
Quantity | : | - | Project Cost ( in Rs Crore) | : | - Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility Approved. EoI issued on 22.9.2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 22-09-2022 | EOI Closing Date | : | 17-11-2022 |
Date and Time | : | 27-10-2022 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Sumeet Bhat | Designation | : | Dte Gen of Armed Corps (AC-3) |
Office Address | : | Dte Gen of Armed Corps (AC-3) Sena Bhawan, IHQ of MoD (Army) New Delhi -110011 Tele - 33564 Email - ddgmf.qmg-ihq@nic.in | Phone | : | Tele - 33564 |
Fax | : | : | ddgmf[dot]qmg-ihq[at]nic[dot]in |
Project Name | : | VSHORADS (Laser Beam Riding) | SHQ | : | Army |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | EOI issued. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 09-02-2023 | EOI Closing Date | : | 08-05-2023 |
Date and Time | : | 27-04-2023 1100 hrs | Venue | : | Directorate General of Army AD, Room No 602 (Army AD Conference Hall), Dl Wing, Sena Bhawan, New Del |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Ajay Verma | Designation | : | Col AD (GM-SP) |
Office Address | : | Directorate General of Army Air Defence, General Staff Branch/Equipment Branch (AAD-7), Room No. 608, D-1 Wing, Sena Bhawan, IHQ of MoD (Army), DHQ PO, New Delhi - 110011. | Phone | : | |
Fax | : | : | skyplan-94[at]gov[dot]in |
Project Name | : | Glidefire SSM | SHQ | : | Navy |
Quantity | : | 115 | Project Cost ( in Rs Crore) | : | 230 Cr. |
Project Brief | : | Click Here | Project Status | : | AIP accorded on 6.4.2022. Feasibility study in progress |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 17-08-2022 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | --7-2 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Lt Cdr Viraat Shiggaon | Designation | : | |
Office Address | : | Integrated Head Quarters, Directorate of Staff Requirements (DSR), Defence Office Complex, 'D' Block, Africa Avenue, New Delhi 110023. | Phone | : | 011-26771339 |
Fax | : | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Aerial Bomb 1000 Kg | SHQ | : | Airforce |
Quantity | : | 300/year | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study stage. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | 7---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Ballistic Helmet | SHQ | : | Army |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Feasibility study in prog. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 17-02-2023 | EOI Closing Date | : | 14-04-2023 |
Date and Time | : | 21-03-2023 15:00 hrs | Venue | : | Infantry Directorate Conference Hall, Room No. 407, D-1 Wing, Sena Bhawan, New Delhi |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Amitoz Singh, SM | Designation | : | Col Inf-8 |
Office Address | : | Room No 403, D1 Wing, Sena Bhawan | Phone | : | 011-23012243 |
Fax | : | 011-23019825 | : | suresh1234[at]nic[dot]in |
Project Name | : | Integrated Surveillance and Targeting System for Mechanized Forces | SHQ | : | Army |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | --1-2 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Sumeet Bhat | Designation | : | Col AC-3 |
Office Address | : | R/No 501, A Wing, Sena Bhawan, IHQ of MoD (Army)-11 | Phone | : | 233 33564 |
Fax | : | : | ddgmf[dot]qmg-ihq[at]nic[dot]in |
Project Name | : | Autonomous Combat Vehicle (ACV) | SHQ | : | Army |
Quantity | : | Project Cost ( in Rs Crore) | : | Cr. | |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | 1---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Rishi Deora | Designation | : | Col MECH-8, ADG MECH INF |
Office Address | : | Room No 528, A Wing Sena Bhawan, IHQ of MoD (Army)-110011 | Phone | : | 23332537 |
Fax | : | : | amimat[dot]03315[at]gov[dot]in |
Project Name | : | Development of Wearable Robotic Equipment | SHQ | : | Airforce |
Quantity | : | 150 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----1 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Full Motion Simulator for Apache Helicopter | SHQ | : | Airforce |
Quantity | : | 1 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Full Motion Simulator for Chinook Helicopter | SHQ | : | Airforce |
Quantity | : | 01 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Infantry weapon training simulator (IWTS) | SHQ | : | Army |
Quantity | : | 133 (IA-66, IN-32 & IAF-35) | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 25th October 2022. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 28-09-2020 |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 06-10-2021 | EOI Closing Date | : | 06-12-2021 |
Date and Time | : | 01-11-2021 1100 hrs | Venue | : | Infantry Directorate Conference Hall R no. 407, 4th Floor, D-1 wing sena bhawan, ND-110011 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Colonel Tapan Kumar Pant, SC | Designation | : | Col Infantry |
Office Address | : | Secretary, Project Facilitation Team Infantry-5/ Directorate General of Infantry Integrated HQ of MoD (Army) Room Number 411B, D-1 Wing, Sena Bhawan DHQ PO, New Delhi-110011 | Phone | : | 011-23018398 |
Fax | : | : | khanjar[at]nic[dot]in |
Project Name | : | Marine Sewage Treatment Plant | SHQ | : | Navy |
Quantity | : | 10 | Project Cost ( in Rs Crore) | : | 15 Cr. |
Project Brief | : | Click Here | Project Status | : | AoN accorded on 31.1.22. PSO issued on 17.01.2023. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 26-11-2020 |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 26-07-2022 | EOI Closing Date | : | 19-09-2022 |
Date and Time | : | 23-08-2022 11:00 hrs. | Venue | : | Directorate of Naval Architecture Nodal Directorate. The same will also be through VC for outstation |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Rohit Shekhar | Designation | : | Cdr-(NA)- Equip |
Office Address | : | Integrated Headquarters Minstry of Defence (Navy) Directorate of Naval Architecture Room no. 200, Naval HQ Annex, Talkatora Stadium New Dehli 110021 | Phone | : | 9167764221 |
Fax | : | 011-21410483 | : | dna[dot]ihqmod[at]navy[dot]gov[dot]in |
Project Name | : | 80 MM Rockets | SHQ | : | Airforce |
Quantity | : | 5000 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Click Here | Project Status | : | Feasibility study in progress. Case under examination for Make-III. SoC circulated under Make-III. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 27-11-2020 |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : | 25-09-2020 |
Date and Time | : | --3-2 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Ranjeet Singh | Designation | : | Dir PP(AoN & Cat)/B |
Office Address | : | Room No-03, A Wing Sena Bhawan, New Delhi-110011 | Phone | : | 01123011198, 9464346013 |
Fax | : | : | dranc122-ihq[at]nic[dot]in |
Project Name | : | High Endurance Autonomous Underwater Vehicles (HEAUV) | SHQ | : | Navy |
Quantity | : | 1+8 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Project Status | : | EoI issued on 23.03.2023 | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 31-10-2020 |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 23-03-2023 | EOI Closing Date | : | 15-06-2023 |
Date and Time | : | 25-04-2023 1500 hrs | Venue | : | Integrated Headquarters of Ministry of Defence (Navy) Room No. 210 'D |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Secretary, PFT: CDR (SR) - ASW | Designation | : | |
Office Address | : | Directorate of Staff Requirement (DSR) Integrated Headquarters of Ministry of Defence (Navy) Room No. 210 'D' Block Defence Officers Complex Africa Avenue New Delhi, 110023 | Phone | : | 011-26771553 |
Fax | : | 011-26771320 | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | Limpet Mine Mk 414 (7 Kg) and Mk 430 (15 Kg) | SHQ | : | Navy |
Quantity | : | 50-7Kg, 100-15Kg | Project Cost ( in Rs Crore) | : | 20.06 Cr. |
Project Brief | : | Click Here | Project Status | : | AoN accorded on 04.8.21. EOI issued on 22.9.21. PSO issued on 17.1.2022. Prototype development. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 21-09-2021 | EOI Closing Date | : | 25-10-2021 |
Date and Time | : | 11-10-2021 1500 | Venue | : | DAPI |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Lieutenant Commander Abhinav Badhwar | Designation | : | Lt Cdr (API)-AP |
Office Address | : | , Phone No: Fax : | Phone | : | 011-26194691 |
Fax | : | 011-26194273 | : | dapi[dot]ihq[at]navy[dot]gov[dot]in |
Project Name | : | Drone Kill System | SHQ | : | Army |
Quantity | : | 35 | Project Cost ( in Rs Crore) | : | 78.36 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 28th Oct 2022. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 11-01-2022 | EOI Closing Date | : | 08-03-2022 |
Date and Time | : | 17-02-2022 1100 hrs | Venue | : | Directorate General of Army AD, AAD-9 (TCR & Make), New Delhi-11011. |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Samudra Vijay Sarma, | Designation | : | Col AAD-9 (TCR & Make) |
Office Address | : | Room No 607, A Wing, Sena Bhawan, | Phone | : | 23334884 |
Fax | : | : | skyplan-94[at]gov[dot]in |
Project Name | : | Autonomous Surface Vessel in Mine Counter Measures | SHQ | : | Navy |
Quantity | : | 1+10 | Project Cost ( in Rs Crore) | : | Cr. |
Project Brief | : | Project Status | : | EoI issued on 17.03.2023. | |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 27-10-2020 |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 16-03-2023 | EOI Closing Date | : | 10-06-2023 |
Date and Time | : | 19-04-2023 1500 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Secretary, PFT | Designation | : | CDR (SR) - ASW |
Office Address | : | Directorate of Staff Requirement (DSR) Integrated Headquarters of Ministry of Defence (Navy) Room No. 210 'D' Block Defence Officers Complex Africa Avenue New Delhi, 110023 | Phone | : | 011-26771553 |
Fax | : | 011-26771320 | : | dsr[at]navy[dot]gov[dot]in |
Project Name | : | V/UHF Software Define Radio | SHQ | : | Army |
Quantity | : | 600 | Project Cost ( in Rs Crore) | : | 179.12 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 17.02.2021. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 23-06-2020 | EOI Closing Date | : | 21-08-2020 |
Date and Time | : | 04-08-2020 1030 hrs | Venue | : | |
Meeting Notice | : | Click Here | Clarifications post meeting | : |
Name | : | Lt Col Hanna P | Designation | : | DG Sigs |
Office Address | : | DG Sigs, Sena Bhawan | Phone | : | 23333685, 9401344745 |
Fax | : | : | root[dot]tech213[at]nic[dot]in |
Project Name | : | HF Software Define Radio | SHQ | : | Army |
Quantity | : | 300 | Project Cost ( in Rs Crore) | : | 145 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 21st Oct 2022. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 23-05-2022 | EOI Closing Date | : | 22-08-2022 |
Date and Time | : | --4-0 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Maj Gaurav | Designation | : | DG Sigs, |
Office Address | : | DG Sigs, Sena Bhawan | Phone | : | 2333685, 9621990888 |
Fax | : | : | tac[dot]comns-5[at]gov[dot]in |
Project Name | : | Air Defence Fire Control Radar (light) | SHQ | : | Army |
Quantity | : | 40 | Project Cost ( in Rs Crore) | : | 2171 Cr. |
Project Brief | : | Click Here | Project Status | : | Pre AoN |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 10-06-2022 | EOI Closing Date | : | 04-08-2022 |
Date and Time | : | 07-07-2022 11:00 hrs. | Venue | : | Directorate General of Army AD, AAD-8 (Guns and Sensors), New Delhi - 110001 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col SV Sarma | Designation | : | DG AAD |
Office Address | : | DG AAD, Sena Bhawan | Phone | : | 23334884, 6372071113 |
Fax | : | : | proc[dot]aad-army[at]nic[dot]in |
Project Name | : | Truck Mounted Crane for ULH Regts | SHQ | : | Army |
Quantity | : | 132 | Project Cost ( in Rs Crore) | : | 16.12 Cr. |
Project Brief | : | Click Here | Project Status | : | EOI issued on 22 Jun 21 PSO issued on 06 Jan 2022 Prototype development. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 12-07-2021 | EOI Closing Date | : | 16-08-2021 |
Date and Time | : | --7-0 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col S Mukherjee | Designation | : | Col Arty 5 |
Office Address | : | Phone | : | 23333609, 9168330310 | |
Fax | : | : | aproc[at]nic[dot]in |
Project Name | : | Robotic Surveillance System | SHQ | : | Army |
Quantity | : | 185 in two years | Project Cost ( in Rs Crore) | : | 146.25 Cr. |
Project Brief | : | Click Here | Project Status | : | Pre AoN Stage. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | 7---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Lt Col RK Ranwa | Designation | : | DG RR |
Office Address | : | DGRR Sena Bhawan | Phone | : | 23333328, 8894737585 |
Fax | : | : | gso1rr[at]gmail[dot]com |
Project Name | : | AFV Protection and Counter Measure System | SHQ | : | Army |
Quantity | : | 818 | Project Cost ( in Rs Crore) | : | 5308 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 15 Nov 2021 |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 09-04-2021 | EOI Closing Date | : | 04-07-2021 |
Date and Time | : | ----7 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col RD sharma | Designation | : | Col MoD (Mech) |
Office Address | : | Phone | : | 23335094 | |
Fax | : | : | dcat[dot]java[at]nic[dot]in |
Project Name | : | Portable Helipad | SHQ | : | Army |
Quantity | : | 50 Sets | Project Cost ( in Rs Crore) | : | 80 Cr. |
Project Brief | : | Click Here | Project Status | : | RFP issued on 12th Oct 2022. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 13-04-2021 | EOI Closing Date | : | 29-06-2021 |
Date and Time | : | 10-05-2021 1100 hrs | Venue | : | Combat Engrs Directorate, Engineer-in chief's Branch, New Delhi - 110011 |
Meeting Notice | : | Click Here | Clarifications post meeting | : |
Name | : | Col Seetraman | Designation | : | DGCE |
Office Address | : | DGCE , Sena Bhawan | Phone | : | 23335799, 8988285455 |
Fax | : | : | ce-einc-army[at]nic[dot]in |
Project Name | : | Chaff and flares | SHQ | : | Airforce |
Quantity | : | Chaffs-10,00,000: Flares-1,50,000 (for 5 yr) | Project Cost ( in Rs Crore) | : | 142.62 Cr. |
Project Brief | : | Click Here | Project Status | : | Project Sanction Order issued on 13.12.18. Design and development phase. PDC : Oct 2022 |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 10-07-2018 |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 09-07-2018 | EOI Closing Date | : | 24-09-2018 |
Date and Time | : | 15-08-2018 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr D Patnaik | Designation | : | JD ASR (EW &VE) |
Office Address | : | Dte of ASR (EW & VE) , Air HQ (VB) New Delhi -106 | Phone | : | 23010231 Extn: 7449 |
Fax | : | : | cobra[dot]453[at]gov[dot]in |
Project Name | : | Infrared Imaging Search & Track System (IRST) | SHQ | : | Airforce |
Quantity | : | 100 | Project Cost ( in Rs Crore) | : | 1850.00 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 28.5.19. Design and Development Phase. PDC : Oct 2022 |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 31-08-2018 | EOI Closing Date | : | 12-02-2019 |
Date and Time | : | --5-1 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr R Muraleeswaran | Designation | : | JD Proj (SDI) |
Office Address | : | Room No. 416, Air HQ (VB) New Delhi-110011 | Phone | : | 23010231 |
Fax | : | 23010231 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Foldable Fiberglass Mat (FFM) for Rapid Runway Repair | SHQ | : | Airforce |
Quantity | : | 301 | Project Cost ( in Rs Crore) | : | 235 Cr. |
Project Brief | : | Click Here | Project Status | : | AoN accorded on 24.7.2019. PSO issued on 4.3.2020. Prototype development. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 18-11-2019 | EOI Closing Date | : | 27-12-2019 |
Date and Time | : | 12-12-2019 1100 hrs | Venue | : | Room No - 130, Air HQ (Vayu Bhawan) |
Meeting Notice | : | Click Here | Clarifications post meeting | : |
Name | : | Col Sameer Bhatia | Designation | : | ACE(L) |
Office Address | : | Room No. 135, Air HQ (VB) | Phone | : | 23010231 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | Aerial Fuse for Bomb | SHQ | : | Airforce |
Quantity | : | 15000 @3000/Yr | Project Cost ( in Rs Crore) | : | 708 Cr. |
Project Brief | : | Project Status | : | PSO issued on 10.11.2020. prototype development. PDC : Nov 22 | |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 05-06-2020 | EOI Closing Date | : | 10-08-2020 |
Date and Time | : | 26-06-2020 1000 hrs | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr D Sarfroz Uddin | Designation | : | |
Office Address | : | Dte of ASR Air HQ (VB) New Delhi-106 | Phone | : | 011-23010231/5851 |
Fax | : | 011-23011836 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | 125 kg bomb (akin to MK-81 bomb) | SHQ | : | Airforce |
Quantity | : | 2500 @ 500/yr | Project Cost ( in Rs Crore) | : | 161.8 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 10.11.2020. Prototype development. PDC : Nov 22 |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 19-06-2020 | EOI Closing Date | : | 31-08-2020 |
Date and Time | : | --6-2 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr D Sarfrozuddin | Designation | : | |
Office Address | : | Room No. 451 Air HQ, Vayu Bhawan New Delhi-110011 | Phone | : | 011-23010231 |
Fax | : | 011-23010231 | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | 70 mm Air to Ground Rockets | SHQ | : | Airforce |
Quantity | : | 80000 (over 3-5 years) | Project Cost ( in Rs Crore) | : | - Cr. |
Project Brief | : | Click Here | Project Status | : | Pre-AoN stage. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | 6---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Wg Cdr SS Rao | Designation | : | JD ASR (T-M) |
Office Address | : | Dte of ASR, Air HQ (VB) New Delhi -106 | Phone | : | 011-23010231 Extn: 5832 |
Fax | : | : | vayushashtra[at]nic[dot]in |
Project Name | : | Inflatable Decoys | SHQ | : | Airforce |
Quantity | : | 255 | Project Cost ( in Rs Crore) | : | 281.2 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 6.10.2021. Prototype development. PDC : Sep 22 |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 12-03-2021 | EOI Closing Date | : | 11-06-2021 |
Date and Time | : | 07-04-2021 1100 hrs | Venue | : | Chairman, PFT Gp Capt Ops AD (GW) Room No. 569 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Gp Capt Mukesh Sharma | Designation | : | Director,Acquisition |
Office Address | : | Room No.413, Air Head Quarters (Vayu Bhawan) Rafi Marg New Delhi- 110106 | Phone | : | 011-23013225 |
Fax | : | : | makeind[dot]af[at]gov[dot]in |
Project Name | : | 125mm APFSDS Ammunition for T-72 & T-90 Tank | SHQ | : | Army |
Quantity | : | 85,000 | Project Cost ( in Rs Crore) | : | 1955 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 11.11.2020 |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | --7-0 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col RD Sharma | Designation | : | Col Mod (Mech) |
Office Address | : | Sena Bhawan, NewDelhi | Phone | : | 011-233-5094 |
Fax | : | : | dcat[dot]java[at]nic[dot]in |
Project Name | : | Upgraded Assault Track way | SHQ | : | Army |
Quantity | : | 100 | Project Cost ( in Rs Crore) | : | 100.00 Cr. |
Project Brief | : | Click Here | Project Status | : | Project Sanction Order issued on 5.11.18. RFP issued on 24.9.2020. Contract issued on 1st March 2023. |
Questionnaire | : | Questionnaire Last Date | : | 27-04-2018 |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 19-03-2018 | EOI Closing Date | : | 01-05-2018 |
Date and Time | : | 28-04-2018 1500hrs | Venue | : | Kashmira H |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Seetaraman | Designation | : | DGCE |
Office Address | : | DGCE Room No 91, Combat Engr Dte, E –in -C Branch Kashmir House, Rajaji Marg New Delhi-110011 | Phone | : | 011-23335799, 8988285455 |
Fax | : | 011-23019675 | : | ce5-einc-army[at] nic[dot]in |
Project Name | : | MEAT (Manoeuvrable Expendable Aerial Target) | SHQ | : | Army |
Quantity | : | 125 | Project Cost ( in Rs Crore) | : | 96.03 Cr Cr. |
Project Brief | : | Click Here | Project Status | : | RFP has been issued on 13 July 2020. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | 17-04-2018 | EOI Closing Date | : | 29-05-2018 |
Date and Time | : | --8-2 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col SV Serma | Designation | : | Col AD(EM-Gun)/ Dir(Mod) Armd AD |
Office Address | : | IHQ of MoD (Army), AAD Dte, Room No 606,D-1 Wing, Sena Bhawan, New Delhi | Phone | : | 011-23334884, 6372071113 |
Fax | : | 23334001 | : | proc[dot]aad-army[at]nic[dot]in |
Project Name | : | Night Sight for AGS-30 | SHQ | : | Army |
Quantity | : | 804 | Project Cost ( in Rs Crore) | : | 221 Cr. |
Project Brief | : | Project Status | : | AoN accorded on 15.5.2020. PSO issued on 1.2.2021. | |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | 8---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Amitoz Singh | Designation | : | DG INFCol Inf-8 |
Office Address | : | DG INF, Sena Bhawan, New Delhi-110011 | Phone | : | 011-23335545, 23335211, 9127069778 |
Fax | : | : | suresh1234[at]nic[dot]in |
Project Name | : | 155 mm Terminally Guided Munitions | SHQ | : | Army |
Quantity | : | 1966 | Project Cost ( in Rs Crore) | : | 1239.36 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 28th Oct 2022. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 01-12-2021 | EOI Closing Date | : | 28-03-2022 |
Date and Time | : | 16-12-2021 1100 hrs | Venue | : | Dte General of Artillery, Arty-5 (Plans & New Equipment), New Delhi-110011 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col S Nukherjee | Designation | : | Col Arty-13 |
Office Address | : | DG ARTY, Sena Bhawan, New Delhi | Phone | : | 23333616, 08390990705 |
Fax | : | : | aproc[at]nic[dot]in |
Project Name | : | Unit Level Target System - Air Defence | SHQ | : | Army |
Quantity | : | 142 | Project Cost ( in Rs Crore) | : | 29.4 Cr. |
Project Brief | : | Click Here | Project Status | : | EOI issued on 3.8.21. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 05-08-2021 | EOI Closing Date | : | 04-10-2021 |
Date and Time | : | 13-09-2021 1100 | Venue | : | Dte General of Army, AAD-9 (TCR & Make), New Delhi - 110011 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col SV Sarma | Designation | : | DG AAD |
Office Address | : | DG AAD, Sena Bhawan | Phone | : | 23334884, 6372071113 |
Fax | : | : | proc[dot]aad-army[at]nic[dot]in |
Project Name | : | Mobile Integrated Network Terminal (MINT) | SHQ | : | Army |
Quantity | : | 129 | Project Cost ( in Rs Crore) | : | 285 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 12.3.2021. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | --3-1 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Srikanth Natarajan | Designation | : | Col Sigs-1 |
Office Address | : | DG Sig, PMO TCS (I/O Sec), Room No 009 Block No P-3 PMO complex, DGIS encla ve, Shankar Vihar New Delhi-10 | Phone | : | 23333744 (23019076), |
Fax | : | 23019076 | : | root[dot]tech613[at]nic[dot]in |
Project Name | : | Augmented Reality (AR) based Head Mounted Display System | SHQ | : | Army |
Quantity | : | 556 | Project Cost ( in Rs Crore) | : | 135.81 Cr. |
Project Brief | : | Click Here | Project Status | : | AoN accorded on 8.7.2020. PSO issued on 22.2.2021. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 17-08-2020 | EOI Closing Date | : | 28-08-2020 |
Date and Time | : | 07-09-2020 1100hrs | Venue | : | AAD-9 Integrated HQ of MoD (Army) Room No 608, D1 Wing Sena Bhawan New Delhi |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Vikram Devgan | Designation | : | DG AAD |
Office Address | : | Col Samudra Vijay Sarma, Col AD (ET & Make), AAD-9, Secretary, Project Facilitation Team Augmented Reality Head Mounted Display (ARHMD) Army Air Defence Directorate/ AAD-9 Integrated HQ of MoD (Army) Room No 608, D1 Wing Sena Bhawan DHQ PO, New Delhi – 110011 email id – skycoord94@nic.in Tele No – 34884 | Phone | : | 23334884, 6006594387 |
Fax | : | : | proc[dot]aad-army[at]nic[dot]in |
Project Name | : | 3rd Gen ATGM (Anti Tank Guided Missile) System | SHQ | : | Army |
Quantity | : | Missiles: 2330, Launcher: 101, Simulator: 06 | Project Cost ( in Rs Crore) | : | 1538.08 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 16.11.2020. |
Questionnaire | : | Click Here | Questionnaire Last Date | : | 05-11-2018 |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 07-02-2020 | EOI Closing Date | : | 23-03-2020 |
Date and Time | : | 26-02-2020 1430 hrs | Venue | : | Infantry Directorate Conference Hall Rno. 407 4th floor D-1 wing Sena Bhawan New Delhi - 110011 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Lt col Parvej | Designation | : | Col Inf 5/ Inf Dte |
Office Address | : | DG INF Sena Bhawan | Phone | : | 23333821, 23333813, 8287792156 |
Fax | : | 23018398 | : | khanjar[at]nic[dot]in |
Project Name | : | Integrated air Defence Combat Simulator - Suo-Moto | SHQ | : | Army |
Quantity | : | 16 | Project Cost ( in Rs Crore) | : | 162 Cr. |
Project Brief | : | Click Here | Project Status | : | EoI uploaded on 24.8.21. PSO issued on 24 Mar 2022 Prototype development. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 24-08-2021 | EOI Closing Date | : | 25-10-2021 |
Date and Time | : | 04-08-2021 1100 hrs | Venue | : | Dte General of Army AD, AAD-9(TCR& Mak) ND -11011e |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col SV Sarma | Designation | : | DG AAD |
Office Address | : | DG AAD, Sena Bhawan | Phone | : | 23334884 |
Fax | : | : | proc[dot]aad-army[at]nic[dot]in |
Project Name | : | Pre-fragmented programmable proximity fuzed ammunition | SHQ | : | Army |
Quantity | : | 3,30,000 over 12 years | Project Cost ( in Rs Crore) | : | 30.6 Cr. |
Project Brief | : | Click Here | Project Status | : | SoC being formulated. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | EOI Closing Date | : |
Date and Time | : | --4-0 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col SV Sarma | Designation | : | Dir (Planning) |
Office Address | : | Army Air Def Directorate, Room No. 606, D-1 Wing Sena Bhawan New Delhi-110011 | Phone | : | 011-23334884, 6372071113 |
Fax | : | 011-23334001/ 23333632 | : | proc[dot]aad-army[at]nic[dot]in |
Project Name | : | GPS/GIS based Minefield Recording System | SHQ | : | Army |
Quantity | : | 1840 | Project Cost ( in Rs Crore) | : | 292.35 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 10.12.2020. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 13-07-2020 | EOI Closing Date | : | 17-08-2020 |
Date and Time | : | 4---- | Venue | : | |
Meeting Notice | : | Click Here | Clarifications post meeting | : |
Name | : | Col Kabir Kashyap | Designation | : | DG CE |
Office Address | : | DG CE, Sena Bhawan | Phone | : | 23335799, 9953659920 |
Fax | : | : | ce-einc-army[at]nic[dot]in |
Project Name | : | Medium Range Precision Kill System | SHQ | : | Army |
Quantity | : | 10 | Project Cost ( in Rs Crore) | : | 229.5 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 4th November 2022. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 17-12-2021 | EOI Closing Date | : | 14-12-2021 |
Date and Time | : | 24-01-2022 1100 | Venue | : | Dte General of Artillery, Arty-12 (Missiles), ND 110011 |
Meeting Notice | : | Clarifications post meeting | : | Click Here |
Name | : | Col Arun Kalia | Designation | : | Col Arty - 13 |
Office Address | : | DG Arty, Sena Bhawan, New Delhi | Phone | : | 011-23333617, 9783800881 |
Fax | : | 23335092 | : | aproc[at]nic[dot]in |
Project Name | : | Upgrade for BMP2/2K | SHQ | : | Army |
Quantity | : | 811 | Project Cost ( in Rs Crore) | : | 4210.71 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 14-09-2020 | EOI Closing Date | : | 14-12-2020 |
Date and Time | : | --4-2 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Vikas Bhola, | Designation | : | Col Mech-9 |
Office Address | : | ADG Mech Inf, ISE, Room No - 525, 5th Floor, Sena Bhawan | Phone | : | 23332538 |
Fax | : | : | dcat[dot]321[at]gov[dot]in |
Project Name | : | Auxiliary Power Unit (APU) | SHQ | : | Army |
Quantity | : | 3257 (Qty 1600 for Tank T-72 and 1657 for Tank T-90) | Project Cost ( in Rs Crore) | : | Rs 1325.92 Crs Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 9.11.2020 |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 29-01-2020 | EOI Closing Date | : | 06-04-2020 |
Date and Time | : | 4---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Col Kashyap | Designation | : | Col Mod (MEch) |
Office Address | : | Room No-03, A Wing Sena Bhawan, New Delhi-110011 | Phone | : | 01123335094 |
Fax | : | : | dcat[dot]java[at]nic[dot]in |
Project Name | : | Deep Sea Side Scan Sonar Towing Winch (DS4TW) | SHQ | : | Navy |
Quantity | : | 06 | Project Cost ( in Rs Crore) | : | 05.54 Cr. |
Project Brief | : | Click Here | Project Status | : | Project Sanction order issued on 27.8.18. Prototype development completed on 26th Aug 2019. Contract issued on 4.2.2022. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 11-05-2018 | EOI Closing Date | : | 22-06-2018 |
Date and Time | : | ----4 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Amol G Merwarde | Designation | : | Cdr (H) |
Office Address | : | IHQ MoD(N), Directorate of Hydrography 5M, West Block IV, Wing 5 Sector 1, RK Puram New Delhi | Phone | : | 011-26181834, |
Fax | : | 26181834 | : | doh[at]navy[dot]gov[dot]in |
Project Name | : | Proximity, DA and Graze fuse for 76/62 SRGM with universal capability for 76-127mm caliber ammunition | SHQ | : | Navy |
Quantity | : | 130 Prototype Bulk 5000 Fuzes | Project Cost ( in Rs Crore) | : | 241.00 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 18.5.2021. Prototype development. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 18-08-2020 | EOI Closing Date | : | 28-09-2020 |
Date and Time | : | ----- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Lt Cdr Phani Sushant | Designation | : | Cdr (API) |
Office Address | : | IHQ MoD(N), Directorate of Armament Production and Indigenisation, West Block-V, Wing -1, RK Puram, New Delhi | Phone | : | 011-26712719 |
Fax | : | 011-26194273 | : | dapi[dot]ihq[at]navy[dot]gov[dot]in |
Project Name | : | Digital Beam forming based Satellite TV | SHQ | : | Navy |
Quantity | : | 100 | Project Cost ( in Rs Crore) | : | 64.9 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 4th June 2019. FET in progress. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 12-02-2019 | EOI Closing Date | : | 26-03-2019 |
Date and Time | : | 19-03-2019 1530 | Venue | : | Dte of Electrical Engineering, IHQ (MoD) Navy, DII Wing Sena Bhawan, New Delhi -110011 |
Meeting Notice | : | Clarifications post meeting | : | Click Here |
Name | : | Cdr Ashutosh Sharma | Designation | : | Cdr(EE) |
Office Address | : | Directorate of Electrical Engineering (DEE) IHQ MoD(Navy), Room No. 403 DII Wing, Sena Bhawan New Delhi- 110011 | Phone | : | 011- 23011101 |
Fax | : | 011-23011212 | : | dee[at]navy[dot]gov[dot]in |
Project Name | : | Three phase inverters | SHQ | : | Navy |
Quantity | : | 25 | Project Cost ( in Rs Crore) | : | 8.44 Cr. |
Project Brief | : | Click Here | Project Status | : | PSO issued on 30.5.19. FET is in progress. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 21-02-2019 | EOI Closing Date | : | 04-04-2019 |
Date and Time | : | 28-03-2019 1500 | Venue | : | Dte of Air Projects & Plans, IHQ (MoD) Navy, A Block hutments New Delhi - 110011 |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr Manu Vidyarthi | Designation | : | Cdr (APP) |
Office Address | : | Directorate of Air Projects and Plan, IHQ MoD(Navy), Room No. 28, A Block Hutments, DARA Shukoh Road , New Delhi | Phone | : | 011 23011247 |
Fax | : | 011 23793011 | : | dapp[at]navy[dot]gov[dot]in |
Project Name | : | Expendable Underwater Target | SHQ | : | Navy |
Quantity | : | 300 @ 60/yr | Project Cost ( in Rs Crore) | : | 134.52 Cr Cr. |
Project Brief | : | Click Here | Project Status | : | AoN Accorded on 2nd April 2019. PSO issued on 15.2.2021. Prototype development. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 14-06-2019 | EOI Closing Date | : | 24-10-2019 |
Date and Time | : | 04-09-2019 1130 hrs | Venue | : | Directorate of staff Requirements (DSR), IHQ MoD(Navy), A Block, Dara Shikoh Road, New Delhi- 110011 |
Meeting Notice | : | Clarifications post meeting | : | Click Here |
Name | : | Cdr Arjit Pande | Designation | : | Cdr (SR) |
Office Address | : | IHQMoD(N), Directorate of Staff Requirements 56 A Block Hutments, Sena Bhawan IHQ MoD(N), New Delhi | Phone | : | 011- 23010948 011-23010241 |
Fax | : | : | dsr-navy[at]nic[dot]in |
Project Name | : | Effectors for Anti-Torpedo Counter Measure System | SHQ | : | Navy |
Quantity | : | 174 | Project Cost ( in Rs Crore) | : | 130 Cr. |
Project Brief | : | Click Here | Project Status | : | AoN accorded on 8.7.2020. PSO issued on 31.3.2021 and PDC extended by 15 months from Mar 22 to Jul 23. |
Questionnaire | : | Click Here | Questionnaire Last Date | : |
EOI Document | : | Click Here | |||
EOI Opening Date | : | 08-10-2020 | EOI Closing Date | : | 18-12-2020 |
Date and Time | : | --4-0 | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cdr S Dutt Roy | Designation | : | Cdr (API) |
Office Address | : | Dte of Armament, Production & Indigensation, West Block V, Wing I, RK Puram, New Delhi | Phone | : | 26107491 |
Fax | : | 26194273 | : | dapi[dot]ihq[at]navy[dot]gov[dot]in; |
Project Name | : | Upper Air Sounding System (UASS) | SHQ | : | Navy |
Quantity | : | 24(Navy)+ 36(Army) | Project Cost ( in Rs Crore) | : | 40.00 Cr. |
Project Brief | : | Click Here | Project Status | : | RFP issued on 22.7.2021. Staff evaluation in progress. |
Questionnaire | : | Questionnaire Last Date | : |
EOI Document | : | ||||
EOI Opening Date | : | 17-05-2018 | EOI Closing Date | : | 31-07-2018 |
Date and Time | : | 4---- | Venue | : | |
Meeting Notice | : | Clarifications post meeting | : |
Name | : | Cmde Manoj Kumar Singh | Designation | : | PDNOM |
Office Address | : | Directorate of Naval Oceanography and Meteorology, | Phone | : | 011- 21410476 |
Fax | : | 011- 21410476 | : | dnom-navy[at]nic[dot]in |